Inground Swimming Pool Deck Lot Coverage & Runoff Trench Calculator

Check combined pool coping, patio surround, and equipment pad square footage against municipal zoning caps and size overflow infiltration.

βœ“ Instant 4-Page PDF + Vector SVG βœ“ Zero Account Required βœ“ 100% Inspector Acceptance Guarantee
CALCULATING...
0%
πŸͺ¨ Excavation & Gravel Saver Hardware β€” Cut Digging & Hauling in Half
Modular 50-gallon drywell chambers store 100% water (vs. 40% in gravel), slashing pit length and tons of stone:

Download Complete 4-Page Permit PDF + Vector Schematic

Instant self-serve download + 30-Day Magic Edit Link (change address or numbers anytime free).

Single Permit Packet
$24 One-Time
  • βœ“ Full 4-Page Official Calculation PDF
  • βœ“ Vector Plan & Cross-Section C-1 (SVG)
  • βœ“ 30-Day Magic Link (unlimited edits)
No Subscription Β· 5-Pack
$79 / 5 Permits
  • βœ“ $15.80 per permit packet
  • βœ“ Credits never expire
  • βœ“ Your Company Logo + License #
Contractor Pro Unlimited
$35 / month
  • βœ“ Unlimited Branded Permit PDFs
  • βœ“ Company Logo & License Header
  • βœ“ Cancel anytime in 1 click
πŸ›‘οΈ 100% AHJ / HOA Acceptance Guarantee: Full refund within 30 days if rejected. πŸ”’ Stripe Β· Apple Pay & Credit Card
LIVE 4-PAGE PERMIT PACKET PREVIEW
Site:
DOC: RP-2026-PREVIEW
πŸ”’ Official Code Schedule & Vector Schematic Locked
Unlock instant 4-page PDF download + 30-day self-service editing above.
Ln Description & Prescriptive Formula Code Ref Input Calculated

Worked Prescriptive Calculation Example: Inground Swimming Pool Deck Lot Coverage & Runoff Trench Calculator

Below is a complete step-by-step mathematical schedule generated from standard nameplate ratings so municipal plan examiners, homeowners, and contractors can verify every code formula:

Line Step Description & Formula Code Reference Rating Calculated
1 Impervious Lot Coverage Ratio: (Existing - Removed + New Γ— 1.00 Credit) / Lot Area (PASS) Zoning ≀ 35.0% 12000 sf Lot Β· 650 sf New 31.2%
2 Required Design Storm Capture Volume (Gross New Impervious Area Β· Direct Surface Capture) V = A Γ— (P/12) Γ— C 1.50 in (C=1.00) 608 gal (81.2 ftΒ³)
3 Crushed Washed Angular Stone Infiltration Trench (AASHTO #57 Β· 40% Void Ratio Β· 17.0' L Γ— 4.0' W Γ— 3.0' D) AASHTO #57 Trench 17.0' L Γ— 4.0' W Γ— 3.0' D 610 gal (81.6 ftΒ³)
4 Construction Material Take-Off: Clean Washed Stone (+5% waste) & 4 oz Non-Woven Geotextile (+15% overlap) Field Take-Off 204.0 ftΒ³ Stone 11.11 tons Β· 301 sf Fabric
5 Soil Infiltration Drawdown Time at 0.52 in/hr (13 mm/hr) β€” Must Drain Within ≀ 72.0 Hours (PASS) EPA / MS4 ≀ 72h 0.52 in/hr 27.7 hrs
6 Clearances Check (Foundation 15.0' β‰₯ 15' Β· Lot Line 10.0' β‰₯ 10' Β· Water Table 3.0' β‰₯ 2') & Net Detention COMPLIANT Setbacks OK 610 gal (81.6 ftΒ³)

Frequently Asked Permit & Inspection Questions

Does concrete pool decking count as 100% impervious lot coverage?

Yes. Poured concrete, mortared stone, and porcelain pavers on concrete slabs count at 100% imperviousness, whereas switching the surround to open-joint permeable pavers can qualify for municipal coverage reductions where adopted.