Complete lot coverage + 2-inch storm drywell schedule formatted for 600u20131,000 sq ft backyard ADUs, dadus, and guest houses.
Instant self-serve download + 30-Day Magic Edit Link (change address or numbers anytime free).
| Ln | Description & Prescriptive Formula | Code Ref | Input | Calculated |
|---|
Below is a complete step-by-step mathematical schedule generated from standard nameplate ratings so municipal plan examiners, homeowners, and contractors can verify every code formula:
| Line | Step Description & Formula | Code Reference | Rating | Calculated |
|---|---|---|---|---|
| 1 | Impervious Lot Coverage Ratio: (Existing - Removed + New Γ 1.00 Credit) / Lot Area (PASS) | Zoning β€ 40.0% | 9500 sf Lot Β· 800 sf New | 32.6% |
| 2 | Required Design Storm Capture Volume (Gross New Impervious Area Β· Direct Surface Capture) | V = A Γ (P/12) Γ C | 2.00 in (C=1.00) | 997 gal (133.3 ftΒ³) |
| 3 | Prefabricated Modular Drywell System: 8 Γ 50-Gal Chambers (100% Void) + 40% Stone Collar (25.0' L Γ 4.0' W Γ 2.9' D) | Modular + Stone | 25.0' L Γ 4.0' W Γ 2.9' D | 1087 gal (145.3 ftΒ³) |
| 4 | Construction Material Take-Off: Clean Washed Stone (+5% waste) & 4 oz Non-Woven Geotextile (+15% overlap) | Field Take-Off | 229.8 ftΒ³ Stone | 12.51 tons Β· 423 sf Fabric |
| 5 | Soil Infiltration Drawdown Time at 0.52 in/hr (13 mm/hr) β Must Drain Within β€ 72.0 Hours (PASS) | EPA / MS4 β€ 72h | 0.52 in/hr | 33.5 hrs |
| 6 | Clearances Check (Foundation 15.0' β₯ 15' Β· Lot Line 10.0' β₯ 10' Β· Water Table 3.0' β₯ 2') & Net Detention | COMPLIANT | Setbacks OK | 1087 gal (145.3 ftΒ³) |
Yes. Adding 500u20131,000 sq ft of new roof footprint exceeds typical 250u2013500 sq ft municipal small-project thresholds, requiring an on-site infiltration trench or modular drywell calculation.