Verify existing, demolished, and proposed impervious square footage against 25%u201350% municipal zoning caps with permeable paver credit support.
Instant self-serve download + 30-Day Magic Edit Link (change address or numbers anytime free).
| Ln | Description & Prescriptive Formula | Code Ref | Input | Calculated |
|---|
Below is a complete step-by-step mathematical schedule generated from standard nameplate ratings so municipal plan examiners, homeowners, and contractors can verify every code formula:
| Line | Step Description & Formula | Code Reference | Rating | Calculated |
|---|---|---|---|---|
| 1 | Impervious Lot Coverage Ratio: (Existing - Removed + New Γ 1.00 Credit) / Lot Area (PASS) | Zoning β€ 35.0% | 7500 sf Lot Β· 480 sf New | 34.1% |
| 2 | Required Design Storm Capture Volume (Gross New Impervious Area Β· Direct Surface Capture) | V = A Γ (P/12) Γ C | 1.50 in (C=1.00) | 449 gal (60.0 ftΒ³) |
| 3 | Prefabricated Modular Drywell System: 4 Γ 50-Gal Chambers (100% Void) + 40% Stone Collar (13.0' L Γ 4.0' W Γ 2.9' D) | Modular + Stone | 13.0' L Γ 4.0' W Γ 2.9' D | 561 gal (75.0 ftΒ³) |
| 4 | Construction Material Take-Off: Clean Washed Stone (+5% waste) & 4 oz Non-Woven Geotextile (+15% overlap) | Field Take-Off | 120.7 ftΒ³ Stone | 6.57 tons Β· 233 sf Fabric |
| 5 | Soil Infiltration Drawdown Time at 0.52 in/hr (13 mm/hr) β Must Drain Within β€ 72.0 Hours (PASS) | EPA / MS4 β€ 72h | 0.52 in/hr | 33.3 hrs |
| 6 | Clearances Check (Foundation 15.0' β₯ 15' Β· Lot Line 10.0' β₯ 10' Β· Water Table 3.0' β₯ 2') & Net Detention | COMPLIANT | Setbacks OK | 561 gal (75.0 ftΒ³) |
Proposed coverage equals (Existing Impervious u2212 Demolished Impervious Restored to Lawn + New Impervious u00d7 Surface Credit Factor) divided by Total Lot Area u00d7 100.